THE CGS MODULAR APPROACH
CGS MOD-BLOCS™
Built to fit. Ready to grow.
A revolutionary, efficient way to manufacture and install a gold ADR plant.
01 / FACTORY PREPARED
MANUFACTURE & TESTINGPrepared at the factory.
Ready for your site.
Your plant arrives in several prefabricated, prepared and 100% factory-tested CGS MOD-BLOCS™.
Each module is self-supporting and can be bolted down with minimal effort. The modular system makes future expansion simple and trouble-free.
Process modules bring the equipment for acid wash, elution, acid circulation, carbon screening, regeneration, storage and quench into a coordinated plant layout.

02 / INTEGRATED SKIDS
PUMPING · HEATING · SOLUTION HANDLINGThe services you need.
Already brought together.
Pumping, heating and solution handling are brought together on prefabricated skids.
The skids either ship connected to the process MOD-BLOCS™ or can be bolted directly to the floor underneath them.
This approach organizes the process equipment into prepared assemblies, keeping the on-site installation focused on positioning and connecting the modules.

03 / SITE INSTALLATION
POSITION · BOLT · CONNECTLess assembly.
A clear installation path.
Installation is limited to positioning and connecting the main modules.
- 01
Bolt each of the main MOD-BLOCS™ to the floor.
- 02
Bolt the modules’ pipework together.
- 03
Run the power cable to the junction box on each unit.
The modular approach also supports future expansion as your operation grows.

04 / ACCESS & COMPLETION
WALKWAYS & STAIRWAYSPre-fitted access.
The finishing connection.
Once the CGS MOD-BLOCS™ skids are installed, the prefabricated, pre-fitted walkways and stairways can typically be installed in a few days.
The access structures are prepared to fit the module layout, completing the plant’s walkways and stair connections.